Happy Holloween | Remodeling | Wuensch Construction

Is the outside of your house looking a scary this season?  Who do you want to call

Wuensch Construction we can take the scary out of your house with an exterior face lift.

Need Exterior Face Lift

                         Needs an Exterior Face Lift!

 

 

 

 

 

 

 

 

 

From all of us at Wuensch Construction “Happy Halloween

Jeff Wuensch

 

Bathroom Remodeling | Chaska | Wuensch Construction

Here are some more before and after Bathroom Remodeling pictures that was part of the hunt club remodel Wuensch Construction completed in the Twin Cities West Metro Area.

                                                                   Before

    After

Jeff Wuensch

Hunt Club Remodel | Twin Cities West Metro | Wuensch Construction

These customers in the Twin City West Metro Area called Wuensch Construction in Excelsior, Minnesota. This was a unique challenge for Wuensch Construction because a hundred or so members all owned this hunting club and wanted to remodel there existing club house to fit there needs for a new locker room with large lockers, benches, showers, bathroom and a dressing area. After receiving their dreams and wishes for this locker area Wuensch Construction jumped into action. After three or four different design options, Wuensch Construction came up with a Remodeling Design that they all loved (that was hard to do for hundreds of customers for one single remodeling project).

Here is the before, during and after pictures with the floor plans.

    BEFORE PICTURES

                                           DURING CONSTRUCTION PICTURES

AFTER PICTURES

 

Another job by Wuensch Construction that met and exceeded all of these customers expectations.

Jeff Wuensch

Bathroom Remodeling | Apple Valley Minnesota | Wuensch Construction

This customer in Apple Valley, Minnesota called Wuensch Construction in Excelsior Minnesota because his shower was leaking into his kitchen below. The customer decided after meeting with Wuensch Construction that his existing bathroom had to go. Wuensch Construction jumped into action and designed a new bathroom using the existing cabinets (keep costs down) that the customer fell in loved with, as you will see in the after pictures.

 

Before Picture Gallery:

 

 

After Picture Gallery:

Another Job Wuensch Construction Exceeded the Customer’s Expectations.

Jeff Wuensch

Bathroom Remodeling | Minneapolis | Wuensch Construction

This client in Minneapolis, Minnesota had no bathroom in his un-finish basement so they called Wuensch Construction based out of Excelsior Minnesota to design a bathroom. Wuensch Construction designed this 3/4 Bathroom with a shower, water closet, vanity and linen cabinet for storage. If your thinking of remodeling a bathroom give Wuensch Construction a call and see what we can design for you.

Jeff Wuensch

Home Improvement for a Valentine Gift | Wuensch Construction

Home Improvement | Wuensch Construction

Treat your sweetheart to special surprise…. let your special Valentine gift be one she will use and remember for years to come.

Roses are red, Violets are blue here are a few “Remodeling Tips” that you can do!

Chanhassen Remodeling, Chanhassen Kitchen Remodeling, Chanhassen Kitchen Remodeling Ideas, Home Remodeling Chanhassen, Kitchen Remodeling Chanhassen, Remodeling Chanhassen

Updated Kitchen | Plymouth | Wuensch Construction

Kitchen:

  1. Replace your existing counter tops with new granite counter tops.
  2. Replace your existing sink and faucet.
  3. Give your existing cabinets a face lift.
  4. Install under counter lighting.
  5. Replace your existing appliances.
  6. Replacing your existing floor.
  7. Add new knobs to existing cabinets.
  8. Replace existing light fixtures.
  9. New tile backsplash.
  10. New paint job with color.
Kitchen Remodfeling, Bathroom Remodeling, Excelsior Remodeling Contractor, Chanhassen Remodeling Contractor

Bathroom Remodel | Minneapolis | Wuensch Construction

Bathroom:

  1. Replace your existing vanity top with a granite top and faucet.
  2. Give your existing vanity a face lift.
  3. Replace your existing floor.
  4. Adding towel bars.
  5. Adding crown molding.
  6. New paint job with color.
  7. Replace your existing toilet.
  8. Replace your existing shower door with a frameless glass shower door.
  9. Replacing shower faucets and shower head.
  10. Replace your existing shower with a new ceramic tile shower.

Remember your sweetheart will always remember the special someone who thinks they are their number one fan!

Happy Valentines DayWuensch Construction

Bathroom Remodel | Minneapolis | Wuensch Construction

This Client that lived in Minneapolis called Wuensch Construction, an Excelsior Remodeler, to help him out with his problem in his basement. The client had no bathroom in his basement so with a little vision from Wuensch Construction we came up with a bathroom design the client loved. If you have any remodeling problems you need help with give us a call and we’d love to come out to your house so we can come up with some bathroom designs you might Love.